top of page
  • jesse4430

5/30/2024

ASHLAND COUNTY - A public hearing on Enbridge’s Line 5 pipeline will be held on June 4th. The U.S. Army Corps of Engineers has submitted a draft proposal regarding the pipeline, its safety and where it crosses the Bad River Tribe Reservation. The Bad River tribe has filed a federal lawsuit to make Enbridge remove the segment of Line 5 that runs through tribal land. The reroute proposed by the Corps replaces approximately 20 miles of the existing Line 5 pipeline with 41 miles of a new segment located entirely outside the boundaries of the reservation. Tribal elders say the route is still located near the reservation and therefore would continue to present a hazard to treaty-protected resources.

2 views0 comments

Recent Posts

See All

7/23/2024

ARBOR VITAE - A building in Arbor Vitae sustained substantial damage after a fire on Sunday evening. Firefighters arrived at the home in the 11,000 block of Kern Lane to find a steel storage building

7/23/2024

WASHINGTON (AP) — Vice President Kamala Harris is making her first visit to Wisconsin after locking up enough support from Democratic delegates to win her party’s nomination to challenge former Presid

7/23/2024

WASHINGTON (AP) — Even before President Joe Biden’s withdrawal from the 2024 presidential race, allies of former President Donald Trump floated the possibility of suing to block Democrats from having

Comments


bottom of page