top of page
Search

12/11/2024

  • Writer: Steve Peterson
    Steve Peterson
  • Dec 11, 2024
  • 1 min read

WAKEFIELD - The Michigan department of Transportation has finished the traffic study connected to the intersection of US-2/M28 in Wakefield and have determined that the traffic signal at that intersection is unnecessary and will be removed. The current all-way stop condition will remain in effect. The study determined this was the most appropriate intersection configuration. Next Tuesday morning, the 17th starting around 7 am, a crew will begin removing the existing traffic signal. The work will require the intersection to be closed at times and there may also be lane closures. Michigan State Police will maintain traffic control during the work. MDOT will continue to follow the intersection prior to a planned rebuilding project involving US-2.

 
 
 

Recent Posts

See All
SNOWMOBILE TRAIL REPORT

December 10, 2025: It snowed steadily all day yesterday and there’s more in the forecast. Temps should sit in the mid-20s today, then start dropping hard. By Friday we’re looking at around -10°F , wit

 
 
 
12/10/2025

ASHLAND – A real life grinch in Ashland, but the community comes together to save the day. Hours before Ashland’s annual Christmas tree lighting on Saturday, vandals damaged decorations at Pearson Pla

 
 
 
12/10/2025

MICHIGAN - AAA released its year-end holiday travel outlook for the Christmas travel period Wednesday morning. Much like the Thanksgiving travel period, the agency expects a record number of travelers

 
 
 

Comments


bottom of page